Freitag, 9. Oktober 2009

Even floors and water pipes

The carpenters have been working hard to replace rotten beams and even out the floor (as much as is possible in a house of this age). When this is complete the floor(s) in the L-shaped living / dining room will be at the same level as the kitchen and hallway so that the laminted flooring can be laid.



And downstairs a shower is growing.

Keine Kommentare:

Kommentar veröffentlichen